View previous topic :: View next topic |
Author |
Message |
shousewright
Joined: 05 Jun 2002 Posts: 2 Location: Austin, TX
|
Posted: Thu Jun 06, 2002 1:41 pm Post subject: |
|
|
The limit for "Start when XX consecutive "Bad" results occur" seems to be limited to 32. Is there some type of programming limitation or is it just an arbitrary number?
I'm trying to set up a fairly extensive list of actions based on how long it has been since the test first went bad. One of my actions needs to occur at least one hour into the outage and with the current system, I can get only 32 minutes (test runs every minute). Would there be a possibility of changing that to allow a larger number or am I just missing a way to do it with my current options?
Thanks,
Steve |
|
Back to top |
|
|
KS-Soft
Joined: 03 Apr 2002 Posts: 12806 Location: USA
|
|
Back to top |
|
|
shousewright
Joined: 05 Jun 2002 Posts: 2 Location: Austin, TX
|
Posted: Thu Jun 06, 2002 4:06 pm Post subject: |
|
|
Alex,
That is just what I needed. Thanks for the very quick response.
Steve |
|
Back to top |
|
|
|